2000 |
→ |
Founded in Beijing, August 2000 |
|
|
|
2001 |
→ |
The company acquires the certification of high-new technical products |
|
|
|
2002 |
→ |
The company acquires the licence and operation rights for the importing and exporting |
|
|
|
2003 |
→ |
The company gets the dealership for the luxury yachts of PERMARE, RAFFAELLI from Italy |
|
|
|
2004 |
→ |
The company gets the dealership to sell in China for fruit/vegetable sorting equipment of GREEFA of the Netherland |
|
|
|
2005 |
→ |
The company gets the dealership to sell in China ultra-low oxygen controlling whole sets of equipment of VAN AMERONGEN organization of the Netherland. |
|
→ |
The early sorting line of GREEFA begins to work in China |
|
→ |
Started the cooperates with Latin America LUKER international group in China, and becomes its procurement base in China. |
|
|
|
2006 |
→ |
The contract is signed for a Chinese gypsums board production line of the Chinese early one to be installed in America, which was designed and manufactured solely by a Chinese company |
|
→ |
The early set of atmosphere controlling equipment of VAN AMERONGEN is installed and began to run in China. |
|
→ |
The contract is signed for a Chinese continuous casting machine of the Chinese early one to be installed in America, which was designed and manufactured solely by a Chinese company |
|
→ |
several machines are purchased for food processing and packing of coffee, cookie, candy, chocolate etc. |
|
|
|
2007 |
→ |
The contract is signed for a steelmaking factory revamping project of the Chinese early one in America, which was designed and manufactured solely by the Chinese company |
|
→ |
The contract is signed for a Chinese electrical furnace of the Chinese early one to be installed in America, which was designed and manufactured solely by a Chinese company |
|
|
|
2008 |
→ |
The early Chinese continuous casting machine of the Chinese early one in America is installed and began to run |
|
→ |
The frist electrical furnace of the Chinese early one in America is installed and begins to run |
|
→ |
The contract is signed for a de-dusting system for the steelmaking of the Chinese early one in America, which is one designed and manufactured by a Chinese company |
|
|
|
2009 |
→ |
The steelmaking revamping project of the Chinese early one in America is finished and accepted, it was one designed and manufactured by the Chinese company |
|
→ |
The early Chinese de-dusting system installed in America began to run, which was designed and manufactured solely by the Chinese company |
|
|
|
2010 |
→ |
The contract is signed for a steel scrap shredding line for the steelmaking in America, which is the Chinese early one designed and manufactured by the Chinese company |
|
→ |
Contracts are signed for the installaion of automatic tube mills in south America |
|
→ |
The contracts are signed for several automatic, various machines for the steel bar processing, welding etc. |
|
|
|
2011 |
→ |
The scrap shredding line was erected and begins to work, it is the Chinaes early one in America designed and manufactured by the Chinese company |
|
→ |
The tube mills are installed and began to work |
|
→ |
The steel bar machines are installed and began to work |
|
→ |
The contract is signed for a SVC electrical net treatment for a steel furnace |
|
|
|
2012 |
→ |
The SVC system is installed and began to treat the electrical net for the EAF |
|
|
|
2013 |
→ |
roll forming lines for floor/drywall etc. |
|
|
|
2014 |
→ |
wire mesh welding lines |
|
→ |
candy packing machines |
|
|
|
2015 |
→ |
pipe galvanizing line |
|
→ |
roll forming lines for floor/drywall etc. |
|
|
|
2017 |
→ |
MRO procurement |
|
|
|
2018 |
→ |
The address of company is changed to Tianzhu town, Shunyi district, Beijing |
|
|
|
2019 |
→ |
The company is certificated as one of piloting sample trading enterprises |
|
|
|
2020 |
→ |
20th Anniversary |
2021 |
→ |
Begin to work in home because of covid-19 pandemic |
2022 |
→ |
One set of LW250x250X8 Directly forming tube mill production line |